RO Period Capacity (kW) Load Factor MWh ROCs
2006/2007 (3) 3,076 33.8% * 2,246 2,246
2007/2008 3,076 45.0% 12,147 12,147
2008/2009 5,266 64.4% 20,066 20,066
2009/2010 5,266 47.9% 20,595 20,595
2010/2011 5,266 74.2% 34,222 34,222
2011/2012 6,331 72.8% 40,458 40,458
2012/2013 6,331 74.2% 41,166 41,166
2013/2014 6,331 76.3% 42,319 42,319
2014/2015 6,331 76.1% 42,183 42,183
2015/2016 6,331 74.0% 41,165 41,165
2016/2017 6,331 81.0% 40,817 40,817
2017/2018 5,266 84.1% 38,773 38,773
Annual Totals to end May-18 38,41331,998
Rolling Load Factor70.5 %
Annual Load Factor to end May-1883.3 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.