R00025RPEN G01169FWEN : Lincs Wind Farm

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2012/2013 (7) 270,000 1.7% * 22,919 38,899
2013/2014 270,000 36.5% 862,206 1,724,410
2014/2015 270,000 36.8% 871,156 1,742,310
2015/2016 270,000 43.3% 1,026,230 2,052,450
2016/2017 270,000 39.4% 930,886 1,861,770
2017/2018 270,000 44.9% 1,062,130 2,124,260
Annual Totals to end May-18 1,057,8501,832,980
Rolling Load Factor38.4 %
Annual Load Factor to end May-1844.7 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.