R00108RAEN G00261BWEN : Cottam Power Station (RB) - A,B,C,E

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2004/2005 (10) 19,451 46.4% * 78,982 62,633
2005/2006 29,340 46.4% 119,136 119,136
2006/2007 19,177 46.4% 77,870 77,870
2007/2008 24,381 46.4% 98,998 98,998
2008/2009 53,623 46.4% 217,736 217,736
2009/2010 28,518 51.1% 127,638 65,187
2010/2011 36,096 57.5% 181,693 92,168
2011/2012 31,965 59.2% 165,760 82,880
2012/2013 23,388 64.0% 131,058 65,529
2013/2014 (11) 7,819 66.0% * 45,193 13,558
2014/2015 (11) 8,976 50.4% * 39,613 11,884
2015/2016 (10) 5,089 33.5% * 14,938 7,469
2016/2017 (7) 35,467 14.1% * 43,738 21,869
2017/2018 (3) 909 20.8% * 1,654 827
Annual Totals to end Sep-17 43,51221,756
Rolling Load Factor46.5 %
Annual Load Factor to end Sep-1712.2 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.