GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2012/2013 (2) 4,700 15.2% * 1,013 1,013
2013/2014 4,700 21.4% 8,809 8,809
2014/2015 4,700 18.5% 7,611 7,611
2015/2016 4,700 22.3% 9,214 9,214
2016/2017 4,700 18.3% 7,537 7,537
2017/2018 4,700 15.8% 6,522 6,522
2018/2019 4,700 17.8% 7,312 7,312
2019/2020 4,700 21.9% 9,039 9,039
2020/2021 4,700 21.3% 8,768 8,768
2021/2022 4,700 17.3% 7,119 7,119
2022/2023 4,700 18.8% 7,729 7,729
2023/2024 (8) 4,700 16.2% * 4,453 2,931
Annual Totals to end Nov-23 7,2965,774
Rolling Load Factor19.3 %
Annual Load Factor to end Nov-2317.7 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.