R00324RAEN G01637BWEN : Ridham Dock biomass plant

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2015/2016 (9) 25,000 60.9% * 100,468 150,695
2016/2017 25,000 63.7% 139,426 209,129
2017/2018 (11) 25,000 74.9% * 150,142 225,202
Annual Totals to end Apr-18 151,680203,213
Rolling Load Factor64.9 %
Annual Load Factor to end Apr-1869.3 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.