R00741RUEN G07349PVEN : Swindon Solar Park

Return to Results

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2016/2017 (9) 60,893 7.6% * 30,599 39,780
2017/2018 60,893 11.0% 58,615 76,203
2018/2019 60,893 11.7% 62,580 81,357
2019/2020 60,893 11.1% 59,265 77,048
2020/2021 60,893 11.8% 62,924 81,804
2021/2022 60,893 10.9% 57,976 75,372
2022/2023 60,893 11.3% 60,225 78,296
2023/2024 (7) 60,893 15.2% * 47,441 56,774
Annual Totals to end Oct-23 57,94270,427
Rolling Load Factor11.3 %
Annual Load Factor to end Oct-2310.9 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.