IDRO ID or Rego ID uniquely identifying generator | Generator Name | CountryThe Renewables Obligation is administered in three areas, Northern Ireland, Scotland, and England/Wales. This field shows the country where the generator is located. | IC (kW)The total installed generating capacity of each generator in kilowatts (kW), as recorded by Ofgem. REF has corrected obvious errors. | TechnologyRenewable technology type | SubsidySubsidy mechanism RO,FiT,None | AccreditationThe date at which the generator was accorded accredited status with Ofgem; this is usually the date of first generation. | CommissionedDate when generator first commissioned | RLFThe rolling load factor is the average of all available rolling 12 month periods in the currently available data for the site. | ALFThe most recent annual load factor to year ending at Latest ROC Date | LatestDataLatest date for ROCs received | Latest MWh p.a.MWh generated in the latest year for which data is available | Latest ROCs p.a.ROCs earned in the latest year for which data is available |
| HR2 | Hornsea 2 | England | 1,320,000 | Off-shore wind | CfD | 2022-01-19 | 2024-03-28 | 43.4% | 41.3% | 2025-09 | 4,775,730 | |
| DRX | Drax CfD Unit 1 | England | 645,000 | Dedicated biomass | CfD | 2016-12-21 | 65.7% | 82.0% | 2025-09 | 4,635,490 | ||
| HOR | Hornsea 1 | England | 1,200,000 | Off-shore wind | CfD | 2019-02-26 | 2021-03-31 | 44.6% | 43.9% | 2025-09 | 4,617,670 | |
| EAS | East Anglia 1 Offshore | England | 714,000 | Off-shore wind | CfD | 2019-09-02 | 2020-05-30 | 42.8% | 41.5% | 2025-09 | 2,593,080 | |
| TKN | Triton Knoll | England | 857,250 | Off-shore wind | CfD | 2021-03-05 | 2023-03-31 | 35.6% | 33.9% | 2025-09 | 2,518,860 | |
| WAL | Walney Extension | England | 660,000 | Off-shore wind | CfD | 2017-09-02 | 2018-04-13 | 43.5% | 42.0% | 2025-09 | 2,425,940 | |
| LYN | Lynemouth Power Station | England | 406,790 | Dedicated biomass | CfD | 2019-04-01 | 2018-06-23 | 53.1% | 64.0% | 2025-09 | 2,280,940 | |
| BEA | Beatrice Offshore | Scotland | 588,000 | Off-shore wind | CfD | 2018-07-18 | 2019-04-28 | 38.0% | 36.5% | 2025-09 | 1,878,090 | |
| MOE | Moray East | Scotland | 950,000 | Off-shore wind | CfD | 2021-06-22 | 2024-03-04 | 24.3% | 18.5% | 2025-09 | 1,542,300 | |
| T_MOWWO | Moray West | Scotland | 884,000 | Off-shore wind | None | 2024-07-08 | 19.8% | 19.5% | 2025-09 | 1,503,940 | ||
| DUD | Dudgeon Offshore | England | 402,000 | Off-shore wind | CfD | 2017-09-19 | 2017-10-01 | 45.9% | 43.1% | 2025-09 | 1,490,340 | |
| T_SGRWO | Seagreen Wind Energy Limited | Scotland | 1,140,000 | Off-shore wind | None | 2022-08-22 | 2022-08-22 | 14.4% | 14.3% | 2025-09 | 1,428,160 | |
| TEE | Teesside Biomass | England | 299,000 | Dedicated biomass | CfD | 2022-08-09 | 2023-09-30 | 29.5% | 52.0% | 2025-09 | 1,310,360 | |
| NEA | Neart na Gaoithe | Scotland | 453,600 | Off-shore wind | CfD | 2024-10-29 | 2025-04-16 | 2025-09 | 1,071,240 | |||
| T_DBAWO | Dogger Bank A | England | 1,200,000 | Off-shore wind | None | 2024-01-16 | 2023-10-07 | 2.9% | 7.9% | 2025-09 | 827,863 | |
| BUR | Burbo Bank Extension | England | 259,000 | Off-shore wind | CfD | 2016-11-12 | 2017-04-11 | 38.8% | 35.1% | 2025-09 | 794,288 | |
| T_VKNGW | Viking | Scotland | 442,900 | On-shore wind | None | 2024-01-16 | 16.0% | 15.4% | 2025-09 | 597,649 | ||
| T_SOKYW | South Kyle | Scotland | 240,000 | On-shore wind | None | 2023-08-14 | 2022-09-16 | 25.3% | 23.4% | 2025-09 | 488,139 | |
| CLO | Clocaenog Forest Wind Farm | Wales | 95,680 | On-shore wind | CfD | 2020-11-05 | 2019-10-31 | 27.3% | 25.7% | 2025-09 | 215,452 | |
| DOR | Dorenell Wind Farm | Scotland | 177,000 | On-shore wind | CfD | 2019-07-16 | 2018-12-20 | 23.0% | 14.1% | 2025-09 | 215,068 | |
| T_CLVHS | Cleve Hill | England | 317,000 | Photovoltaic | None | 2025-03-25 | 2025-09 | 209,232 | ||||
| BKM | Kype Muir Wind Farm | Scotland | 88,400 | On-shore wind | CfD | 2018-10-12 | 2019-03-28 | 25.5% | 25.8% | 2025-09 | 197,189 | |
| T_AKGLW | Aikengall IIA | Scotland | 82,000 | On-shore wind | None | 2021-12-17 | 2021-08-07 | 25.0% | 26.4% | 2025-09 | 189,163 | |
| T_KYPEW | Kype Muir Extension | Scotland | 67,200 | On-shore wind | None | 2023-02-01 | 2022-12-08 | 27.7% | 30.7% | 2025-09 | 180,748 | |
| T_KENNW | Kennoxhead | Scotland | 62,400 | On-shore wind | None | 2022-07-01 | 2022-06-07 | 22.2% | 27.0% | 2025-09 | 147,077 | |
| T_NOKYW | North Kyle | Scotland | 212,000 | On-shore wind | None | 2025-04-03 | 2025-09 | 136,473 | ||||
| T_CREAW | Creag Riabhach Wind Farm Ltd | Scotland | 93,000 | On-shore wind | None | 2023-01-11 | 2022-11-16 | 16.2% | 16.2% | 2025-09 | 131,152 | |
| T_SAKNW | Sandy Knowe Wind Farm Ltd | Scotland | 86,400 | On-shore wind | None | 2022-11-28 | 2022-10-15 | 17.3% | 16.9% | 2025-09 | 128,093 | |
| T_CUMHW | Cumberhead Wind | Scotland | 57,600 | On-shore wind | None | 2023-03-21 | 2023-02-01 | 23.3% | 26.9% | 2025-09 | 127,778 | |
| NAN | Nanclach Wind Farm | Scotland | 39,100 | On-shore wind | CfD | 2021-09-06 | 2019-10-01 | 34.1% | 32.9% | 2025-09 | 112,607 | |
| E_BTUIW | Beinn an Tuirc 3 | Scotland | 50,000 | On-shore wind | None | 2021-04-17 | 2021-05-20 | 27.3% | 24.9% | 2025-09 | 108,880 | |
| BMM | Middle Muir Wind Farm | Scotland | 51,000 | On-shore wind | CfD | 2018-09-05 | 2019-01-09 | 22.2% | 23.2% | 2025-09 | 102,919 | |
| T_WDRGW | Windy Rig Wind Farm | Scotland | 43,200 | On-shore wind | None | 2022-07-28 | 2021-07-13 | 29.6% | 26.4% | 2025-09 | 99,858 | |
| BRE | Brenig Wind Farm | Wales | 37,600 | On-shore wind | CfD | 2019-10-18 | 2019-03-29 | 32.0% | 29.9% | 2025-09 | 98,500 | |
| T_CRDEW | Crossdykes Wind Farm | Scotland | 48,350 | On-shore wind | None | 2020-10-16 | 2020-12-11 | 23.6% | 21.8% | 2025-09 | 91,613 | |
| T_TWSHW | Twentyshilling | Scotland | 37,800 | On-shore wind | None | 2022-07-29 | 2021-09-23 | 29.9% | 27.0% | 2025-09 | 89,469 | |
| MYN | Mynydd Y Gwair Wind Farm | Wales | 32,210 | On-shore wind | CfD | 2019-07-05 | 2019-03-20 | 35.8% | 30.9% | 2025-09 | 87,282 | |
| E_BLARW | Blary Hill | Scotland | 35,000 | On-shore wind | None | 2021-11-15 | 2021-10-27 | 28.4% | 28.0% | 2025-09 | 85,809 | |
| T_DALQW | Dalquhandy Wind Farm | Scotland | 42,000 | On-shore wind | None | 2022-12-29 | 2022-09-29 | 22.5% | 23.0% | 2025-09 | 84,519 | |
| SOL | Solway Wind Farm | Scotland | 30,000 | On-shore wind | CfD | 2021-09-21 | 2020-11-27 | 27.0% | 29.8% | 2025-09 | 78,112 | |
| T_DOUGW | Douglas West Wind Farm | Scotland | 46,800 | On-shore wind | None | 2022-05-25 | 2021-07-07 | 21.2% | 19.1% | 2025-09 | 77,839 | |
| K3C | Kemsley K3 CHP | England | 45,000 | Waste | CfD | 2021-03-16 | 2020-07-17 | 32.9% | 19.7% | 2025-09 | 77,626 | |
| T_BURWS | Burwell Solar | England | 69,868 | Photovoltaic | None | 2023-12-01 | 12.0% | 14.0% | 2025-09 | 75,193 | ||
| T_BROCW | Broken Cross | Scotland | 48,000 | On-shore wind | None | 2024-05-17 | 13.9% | 19.4% | 2025-09 | 74,663 | ||
| E_PIBUW | Pines Burn | Scotland | 33,600 | On-shore wind | None | 2024-08-09 | 25.4% | 25.1% | 2025-09 | 73,647 | ||
| E_GRGRW | Greengairs East Wind Farm | Scotland | 36,000 | On-shore wind | None | 2023-05-16 | 2023-04-25 | 23.9% | 23.1% | 2025-09 | 72,777 | |
| SNE | Sneddon Law | Scotland | 30,000 | On-shore wind | CfD | 2023-10-09 | 2024-04-04 | 28.4% | 27.0% | 2025-09 | 71,068 | |
| T_BRCHS | Breach Solar | England | 67,439 | Photovoltaic | None | 2024-07-11 | 11.5% | 12.8% | 2025-09 | 70,626 | ||
| T_SUTBS | Sutton Bridge Solar | England | 73,058 | Photovoltaic | None | 2024-02-16 | 2023-12-18 | 10.8% | 12.5% | 2025-09 | 70,031 | |
| T_GLNKW | Glen Kyllachy Wind Farm | Scotland | 50,000 | On-shore wind | None | 2021-06-22 | 2021-06-21 | 23.0% | 15.3% | 2025-09 | 66,954 | |
| T_LARKS | Larks Green Solar | England | 49,900 | Photovoltaic | None | 2023-03-16 | 2023-04-27 | 13.7% | 15.2% | 2025-09 | 66,422 | |
| COI | Coire Na Cloiche Windfarm | Scotland | 30,520 | On-shore wind | CfD | 2020-02-02 | 2019-06-25 | 25.5% | 25.2% | 2025-09 | 66,289 | |
| T_LIMKW | Limekiln | Scotland | 106,000 | On-shore wind | None | 2025-02-19 | 2025-09 | 66,149 | ||||
| BAD | Bad a Cheo Wind Farm | Scotland | 27,000 | On-shore wind | CfD | 2019-07-05 | 2019-03-31 | 27.0% | 28.7% | 2025-09 | 66,135 | |
| TLG | Tralorg Wind Farm | Scotland | 19,000 | On-shore wind | CfD | 2020-10-14 | 2020-11-13 | 30.5% | 28.8% | 2025-09 | 47,090 | |
| LSF | Litchardon | England | 60,247 | Photovoltaic | CfD | 2023-08-08 | 2025-01-06 | 10.7% | 10.2% | 2025-09 | 45,866 | |
| LYR | Layer | England | 62,682 | Photovoltaic | CfD | 2024-10-14 | 2025-07-15 | 2025-09 | 44,150 | |||
| NEL | Whitecross | England | 35,217 | Photovoltaic | CfD | 2023-07-21 | 2025-03-31 | 12.7% | 18.1% | 2025-09 | 41,691 | |
| T_GORDW | Gordonbush Extension | Scotland | 48,000 | On-shore wind | None | 2021-04-02 | 12.9% | 8.7% | 2025-09 | 36,604 | ||
| T_HALSW | Halsary Windfarm | Scotland | 30,000 | On-shore wind | None | 2020-12-10 | 2020-12-10 | 23.8% | 13.7% | 2025-09 | 36,053 | |
| BMH | Moor House Wind Farm | England | 12,000 | On-shore wind | CfD | 2017-12-22 | 2018-04-03 | 32.3% | 30.7% | 2025-09 | 32,159 | |
| SSF | Stokeford | England | 28,515 | Photovoltaic | CfD | 2024-11-14 | 2025-05-07 | 2025-09 | 29,277 | |||
| BSP | Bishampton | England | 31,547 | Photovoltaic | CfD | 2023-12-12 | 2025-01-20 | 10.5% | 10.7% | 2025-09 | 28,142 | |
| ACH | Achlachan Wind Farm | Scotland | 10,000 | On-shore wind | CfD | 2020-01-15 | 2019-04-08 | 31.8% | 30.4% | 2025-09 | 26,646 | |
| ADS | Adstock | England | 23,523 | Photovoltaic | CfD | 2024-02-22 | 2025-07-01 | 12.0% | 14.0% | 2025-09 | 24,364 | |
| BSL | Basildon | England | 23,295 | Photovoltaic | CfD | 2024-06-21 | 2025-07-01 | 11.8% | 13.8% | 2025-09 | 23,891 | |
| SCL | St Cleres | England | 23,132 | Photovoltaic | CfD | 2024-02-19 | 2025-07-01 | 11.4% | 13.3% | 2025-09 | 23,136 | |
| STV | Staveley | England | 28,927 | Photovoltaic | CfD | 2024-05-02 | 2025-07-09 | 9.0% | 9.7% | 2025-09 | 22,351 | |
| LFS | Low Farm | England | 49,987 | Photovoltaic | CfD | 2024-09-12 | 2025-06-16 | 2025-09 | 21,919 | |||
| MFS | Bicker Fen | England | 22,559 | Photovoltaic | CfD | 2024-03-29 | 2025-05-07 | 10.4% | 10.8% | 2025-09 | 20,306 | |
| ASF | Alfreton | England | 19,895 | Photovoltaic | CfD | 2024-08-21 | 2025-01-22 | 2025-09 | 18,426 | |||
| LIG | Charity Farm Solar | England | 14,402 | Photovoltaic | CfD | 2016-06-23 | 2016-06-30 | 12.9% | 14.5% | 2025-09 | 15,133 | |
| COM | Common Barn Wind Farm | England | 6,150 | On-shore wind | CfD | 2019-03-19 | 2019-06-18 | 30.0% | 27.5% | 2025-09 | 14,641 | |
| ALS | Aller Langport | England | 14,168 | Photovoltaic | CfD | 2024-02-20 | 2025-08-05 | 11.3% | 10.7% | 2025-09 | 12,841 | |
| CAM | Triangle Farm Solar Park | England | 10,900 | Photovoltaic | CfD | 2023-01-13 | 2017-07-18 | 13.5% | 13.4% | 2025-09 | 12,830 | |
| SID | Siddington | England | 20,881 | Photovoltaic | CfD | 2024-10-28 | 2025-08-14 | 2025-09 | 12,696 | |||
| T_HAHAW | Hagshaw Hill | Scotland | 79,800 | On-shore wind | None | 2025-05-02 | 2025-09 | 11,958 | ||||
| CNS | Carn Nicholas | England | 9,914 | Photovoltaic | CfD | 2023-03-31 | 2025-04-17 | 11.5% | 12.3% | 2025-09 | 9,409 | |
| T_TEBWS | Tebworth | England | 40,000 | Photovoltaic | None | 2025-06-24 | 2025-09 | 1,621 | ||||
| R00032RPEN | Race Bank | England | 573,300 | Off-shore wind | RO | 2017-06-08 | 2017-06-08 | 42.5% | 36.4% | 2025-07 | 1,827,670 | 3,438,530 |
| R00022RPEN | Sheringham Shoal | England | 317,000 | Off-shore wind | RO | 2011-09-02 | 2011-09-02 | 37.5% | 32.8% | 2025-07 | 910,302 | 1,859,630 |
| R00025RPEN | Lincs Wind Farm | England | 270,000 | Off-shore wind | RO | 2012-08-27 | 2012-08-27 | 40.2% | 35.9% | 2025-07 | 847,940 | 1,775,880 |
| R00028RPEN | Westermost Rough | England | 210,000 | Off-shore wind | RO | 2014-09-12 | 2014-09-12 | 45.9% | 42.0% | 2025-07 | 772,132 | 1,544,260 |
| R00023RPEN | Walney Offshore Wind Phase II | England | 183,600 | Off-shore wind | RO | 2011-08-25 | 2011-08-25 | 44.3% | 40.3% | 2025-07 | 648,502 | 1,297,000 |
| R00019RPEN | Walney Offshore Wind Phase I | England | 183,600 | Off-shore wind | RO | 2011-02-07 | 2011-01-13 | 38.9% | 33.0% | 2025-07 | 531,049 | 1,062,100 |
| G01962HYSC | Lochaber hydro station 1 | Scotland | 86,500 | Hydro | None | 2019-05-08 | 2011-11-14 | 66.9% | 60.3% | 2025-07 | 456,583 | |
| G00890MWEN | Ferrybridge FM2 | England | 79,280 | Waste | None | 2019-12-19 | 2019-12-19 | 42.1% | 48.9% | 2025-07 | 339,385 | |
| G00878MWEN | Ferrybridge FM1 | England | 81,000 | Waste | None | 2015-07-25 | 2015-07-25 | 35.3% | 40.4% | 2025-07 | 286,681 | |
| R00012RPEN | Gunfleet Sands I | England | 108,000 | Off-shore wind | RO | 2009-07-24 | 2009-07-24 | 34.5% | 28.8% | 2025-07 | 272,599 | 420,917 |
| G00852MWEN | Riverside Resource Recovery Limited | England | 84,900 | Waste | None | 2020-08-07 | 2020-08-07 | 38.4% | 36.4% | 2025-07 | 270,958 | |
| R00011RPEN | Inner Dowsing Offshore Wind Farm | England | 97,200 | Off-shore wind | RO | 2008-04-20 | 2008-04-20 | 35.0% | 30.4% | 2025-07 | 259,002 | 409,889 |
| R00010RPEN | Lynn Offshore Wind Farm | England | 97,200 | Off-shore wind | RO | 2008-03-28 | 2008-03-15 | 34.5% | 28.7% | 2025-07 | 244,506 | 388,281 |
| R00008RPEN | Burbo Offshore Windfarm - A (31/01/07) | England | 90,000 | Off-shore wind | RO | 2007-07-01 | 2007-07-01 | 32.7% | 28.9% | 2025-07 | 227,539 | 353,623 |
| R00251SQSC | Aikengall II Windfarm | Scotland | 60,800 | On-shore wind | RO | 2017-10-25 | 2017-10-25 | 39.6% | 38.9% | 2025-07 | 206,927 | 186,236 |
| G02005BWEN | Newhurst ERF | England | 47,850 | Unknown Biomass | None | 2023-05-24 | 2023-05-24 | 49.7% | 46.0% | 2025-07 | 192,807 | |
| G00891MWEN | Runcorn 2 ERF | England | 53,000 | Waste | None | 2019-11-14 | 2015-07-09 | 40.4% | 40.3% | 2025-07 | 187,038 | |
| R00013RPEN | Gunfleet Sands II | England | 64,800 | Off-shore wind | RO | 2009-07-24 | 2009-07-24 | 36.2% | 32.0% | 2025-07 | 181,662 | 272,480 |
| G00781MWSC | Dunbar ERF | Scotland | 40,025 | Waste | None | 2018-11-07 | 2018-11-07 | 36.4% | 50.6% | 2025-07 | 177,506 | |
| R00299SQSC | Windy Standard II (Brockloch Rig) | Scotland | 61,500 | On-shore wind | RO | 2017-07-03 | 2017-07-03 | 32.2% | 28.7% | 2025-07 | 154,385 | 138,948 |
| R00281SQSC | Blackcraig Wind Farm | Scotland | 52,900 | On-shore wind | RO | 2018-03-03 | 2018-03-03 | 32.5% | 32.9% | 2025-07 | 152,262 | 137,037 |