Search/Filter List of Renewable Generators

Your search returned 4 sites with a capacity of 3,182 MW. In the year to the end of Sep-2023, there were 2
of these sites with a capacity of 2580 MW generating approximately 10,713 GWh and receiving 9,893,115 ROCs.
Page 1 of 1 in descending order of Latest MWh p.a.
IDRO ID or Rego ID uniquely identifying generator
Generator Name
CountryThe Renewables Obligation is administered in three areas, Northern Ireland, Scotland, and England/Wales. This field shows the country where the generator is located.
IC (kW)The total installed generating capacity of each generator in kilowatts (kW), as recorded by Ofgem. REF has corrected obvious errors.
TechnologyRenewable technology type
SubsidySubsidy mechanism RO,FiT,None
AccreditationThe date at which the generator was accorded accredited status with Ofgem; this is usually the date of first generation.
CommissionedDate when generator first commissioned
RLFThe rolling load factor is the average of all available rolling 12 month periods in the currently available data for the site.
ALFThe most recent annual load factor to year ending at Latest ROC Date
LatestDataLatest date for ROCs received
Latest MWh p.a.MWh generated in the latest year for which data is available
Latest ROCs p.a.ROCs earned in the latest year for which data is available
C00083RAEN Drax Biomass Conversion England 1,935,000 Dedicated biomass RO 2003-03-01 1974-01-01 68.5% 58.4% Sep-2023 9,893,120 9,893,120
DRX Drax CfD Unit 1 England 645,000 Dedicated biomass CfD 2016-12-21 66.2% 14.5% Nov-2023 820,195
R00083RAEN Drax Power Station (RB) - A,C,E England 602,397 Biomass co-firing RO 2003-03-01 1974-01-01 66.4% 0.0 Mar-2019 21,380 38,480
R01518NGNI Drax NI 3 Photovoltaic RO 2013-06-06 2013-03-13 Mar-2014 3